免费大片黄在线观看18中文_久久人妻无码AⅤA片麻豆_337P中国人体啪啪_亚洲精品成a人在线观看☆

Architectural engineering
Changle people's Hospital

 
The second phase of the ward building of Changle people's hospital is a frame shear wall structure, with the first floor underground and seventeen floors above the ground,
The total building area is 19034 square meters, and the building height is 62.1 meters. The seismic grade is grade I.
 
Won the 2012 Weifang construction site comprehensive management model project award.